{"id":11540,"date":"2015-11-24T09:49:15","date_gmt":"2015-11-24T08:49:15","guid":{"rendered":"https:\/\/tubi.net\/?post_type=avada_portfolio&#038;p=11540"},"modified":"2022-02-15T15:01:06","modified_gmt":"2022-02-15T14:01:06","slug":"pe-inspection-manholes-made-with-corrugated-pipes-body","status":"publish","type":"avada_portfolio","link":"https:\/\/tubi.net\/en\/prodotto\/pe-inspection-manholes-made-with-corrugated-pipes-body","title":{"rendered":"PE INSPECTION MANHOLES MADE WITH CORRUGATED PIPES BODY"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-background-position:left top;--awb-border-sizes-top:0px;--awb-border-sizes-bottom:0px;--awb-border-sizes-left:0px;--awb-border-sizes-right:0px;--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-padding-top:20px;--awb-padding-right:0px;--awb-padding-bottom:20px;--awb-padding-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last fusion-column-no-min-height\" style=\"--awb-bg-size:cover;--awb-margin-bottom:0px;\"><div class=\"fusion-column-wrapper fusion-flex-column-wrapper-legacy\"><div class=\"fusion-text fusion-text-1\"><h3>PE INSPECTION MANHOLES MADE WITH CORRUGATED PIPES BODY<\/h3>\n<h4>BRIEF DESCRIPTION<\/h4>\n<p>Circular manhole, made of multiple polyethylene (PE) modules, with bases and manhole reductions provided with a socket to accommodate the connection of the extension body made of corrugated pipe. The base can be made with a single or double flat plate. The manhole is available in black colour, with a diameters range that goes from DN 630 up to 1200 mm, in order to allow the inspection of underground pipes which are accessible with DN \u2265 800 mm. The modules allow the creation of in-line manholes, vertex manholes, intersection manholes and backdrop manholes. Modules are preassembled at the factory before the shipment through an extrusion connection made by qualified personnel, but they can also be assembled partially or entirely on the construction site through specific sealing gaskets. The manholes used for inspections are provided with stairs (on request). Suitable for connecting all plastic pipes, but also the stoneware ones. Suitable for applications in areas subject to heavy traffic, combined with an uptight plate for force distribution, for heights of \u2264 5 m and groundwater heights of \u2264 2 m. The wide range of individual modules shapes allows to create various standard modules, but with customised versions too.<\/p>\n<h4>MAIN FEATURES<\/h4>\n<p>100% permanent tightness<br \/>\nStructural reliability<br \/>\nLightweight<br \/>\nHigh ring stiffness corrugated body<br \/>\nBase can be made with a single or double flat plate<br \/>\nEasy and quick to install<br \/>\nPlastic behaviour in unstable situations<br \/>\nWide range of solutions (sizing optimization)<br \/>\nVersatility<br \/>\nInert to stray currents<br \/>\nHigh chemical resistance (ISO\/TR 10358)<br \/>\nHigh abrasion resistance<br \/>\nHigh shock absorption capacity<br \/>\nRecyclable<\/p>\n<\/div><div class=\"fusion-text fusion-text-2\"><p><a href=\"https:\/\/www.youtube.com\/channel\/UCO3EqumhP-V9_wOItDWO8aQ\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" class=\" wp-image-21868\" src=\"https:\/\/tubi.net\/wp-content\/uploads\/2019\/02\/YOU-TUBE.jpg\" alt=\"YOU-TUBE\" width=\"166\" height=\"50\" srcset=\"https:\/\/tubi.net\/wp-content\/uploads\/2019\/02\/YOU-TUBE-300x90.jpg 300w, https:\/\/tubi.net\/wp-content\/uploads\/2019\/02\/YOU-TUBE-768x232.jpg 768w, https:\/\/tubi.net\/wp-content\/uploads\/2019\/02\/YOU-TUBE-1024x309.jpg 1024w, https:\/\/tubi.net\/wp-content\/uploads\/2019\/02\/YOU-TUBE.jpg 1181w\" sizes=\"(max-width: 166px) 100vw, 166px\" \/><\/a><\/p>\n<\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":11,"featured_media":30954,"menu_order":245,"comment_status":"open","ping_status":"open","template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"portfolio_category":[491,489],"portfolio_skills":[589],"portfolio_tags":[],"class_list":["post-11540","avada_portfolio","type-avada_portfolio","status-publish","format-standard","has-post-thumbnail","hentry","portfolio_category-service-chambers","portfolio_category-sewage-chambers","portfolio_skills-sewerage-and-drainage"],"acf":[],"_links":{"self":[{"href":"https:\/\/tubi.net\/en\/wp-json\/wp\/v2\/avada_portfolio\/11540","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tubi.net\/en\/wp-json\/wp\/v2\/avada_portfolio"}],"about":[{"href":"https:\/\/tubi.net\/en\/wp-json\/wp\/v2\/types\/avada_portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/tubi.net\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/tubi.net\/en\/wp-json\/wp\/v2\/comments?post=11540"}],"version-history":[{"count":7,"href":"https:\/\/tubi.net\/en\/wp-json\/wp\/v2\/avada_portfolio\/11540\/revisions"}],"predecessor-version":[{"id":38491,"href":"https:\/\/tubi.net\/en\/wp-json\/wp\/v2\/avada_portfolio\/11540\/revisions\/38491"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tubi.net\/en\/wp-json\/wp\/v2\/media\/30954"}],"wp:attachment":[{"href":"https:\/\/tubi.net\/en\/wp-json\/wp\/v2\/media?parent=11540"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/tubi.net\/en\/wp-json\/wp\/v2\/portfolio_category?post=11540"},{"taxonomy":"portfolio_skills","embeddable":true,"href":"https:\/\/tubi.net\/en\/wp-json\/wp\/v2\/portfolio_skills?post=11540"},{"taxonomy":"portfolio_tags","embeddable":true,"href":"https:\/\/tubi.net\/en\/wp-json\/wp\/v2\/portfolio_tags?post=11540"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}