West Irbid Waste Water Project

In this article we are talking to you about West Irbid Waste Water Project that is currently being supplied and executed in the western villages of Irbid – which in, turn, is a governate with the second-largest metropolitan population in the Hashemite Kingdom of Jordan.

The proximity of Irbid to the Syrian border has resulted in a significant number of Syrian refugees resettling in the city and in the towns surrounding it.

The consequent population growth has placed an unprecedented strain on the wastewater network, particularly in the towns in West of Irbid which suffer already from outdated wastewater collection infrastructure based on cess pits and septic tanks with potential negative impacts on health, soil, groundwater, and biodiversity.

It is here where the Water Ministry in Jordan and the European Development Bank have announced West Irbid project with the objective of replacing the old infrastructure and move to a sewage network system to resolve the problems, generate environmental and social benefits among which the reduction of CO2 emissions in the region of about 1000 tons per year.

The new network had to be built with technical products that are up to the various challenges. It is here where System Group is playing an important role in manufacturing and supplying a complete and homogeneous system of more than 250 KM of HDPE corrugated

SN8 pipes and 5000 HDPE mannoles.

And most importantly guarantee:

1- A homogenous system under one guarantee and variety of special pieces to guarantee different connection possibilities.

2- A cost effective system considering the long life cycle of the product, its easiness of installation, and easy maintenance.

2- Fast delivery. (Around 900 containers to be shipped in record times).

3- Technical training and support.

4- Local technical support through a solid local partner.

In West Irbid – as much as in similar projects in Italy and worldwide – System Group (and in particular its companies Italiana Corrugati and Futura) are proving once more that high level technical know-how, long years of experience, long-term partnerships with local representatives are the key and right elements that System Group will continue to offer to West Irbid and future Jordanian projects at the service of the local population.

➡ For the latest updates and information, please visit our website at www.tubi.net/en. Stay connected with us!